Event-Details

Webinar: Offshore Substations: TSO Requirements for the switch to the 66 KV direct connections

Bundesverband WindEnergie
Veranstalter: Bundesverband WindEnergie
Online

With the construction of offshore wind farms with a capacity of 2 GW and the switch to the 66 kV direct connection, the TSOs are placing increased demands on the integration of the wind farms. Much-discussed requirements for the voltage-forming behaviour are made mandatory by VDE-AR-N 4131, as well as the provision of models for the precise characterisation of the electrical behaviour. Learn about the requirements.